Callouts
This is an online payment to book an ECBC engineer for a Callout. Make sure to choose the right distance and type before paying.
- Connect pipes to the boiler (up to 6 meter copper pipe included)
- Install boiler filter
- Install Zero-Cal
- Commission & test the boiler and system
- Connect wire to the boiler
- Install recommended MCB/RCD or RCBO
- Install recommended rotary isolator switch
- Install wire from consumer box to the boiler (up to 6 meter wire included)
- Install or re-wire thermostat/programmer